BOOK A VISIT
Home / Renovation cost
Guide · renovation cost

What a condo, kitchen, bathroom or full renovation costs in Miami

Typical Miami prices for 2026, by kitchen, bathroom, design and full project, and what moves the number. A typical full renovation project with M5 is $200–250K.

Typical full renovation project: $200–250K
How to read this

How to read these numbers

The ranges below are typical for Miami in 2026, based on market data and our own estimates. They help you plan. Your project gets an itemized, fixed estimate 48 hours after a free site visit, because the building, the layout, the finish level and what is behind the walls all move the number.

Full renovation

Full condo and full house renovation

A typical full renovation project with M5 is $200–250K. What moves a project within and beyond that figure:

  • Size and scope. How many rooms, and how much changes: finishes only, or layouts, kitchens and bathrooms too.
  • The building. In a condo, building rules, approvals and work hours shape the schedule. In a house, structure, roof and openings matter more. See condo and apartment renovation and full home renovation.
  • Finish level. Stone, joinery, plaster and fixtures vary widely in price.
  • Condition. Wiring, plumbing and moisture behind the walls can change the plan once opened.
Kitchens

Kitchens

KitchenTypical price, Miami 2026
Refresh: new fronts, counters, backsplash, lighting$15–25K
Full kitchen remodel: cabinetry, stone, appliances$40–80K
High-end custom kitchen with island and joinery$100–200K

The cost of a kitchen follows how much of it moves. A new layout with relocated plumbing and ventilation costs more than the same footprint with new cabinets. Other drivers are the cabinetry and joinery, stone counters and islands, appliances and lighting. Read about condo kitchens and house kitchens.

Bathrooms

Bathrooms

BathroomTypical price, Miami 2026
Powder room or bathroom refresh$8–14K
Full bathroom remodel$18–35K
Luxury primary bathroom$38–70K

Bathrooms are small rooms with a lot of detail: layout, waterproofing, stone or tile, fixtures and lighting. Plaster is an option too, since Venetian plaster and marmorino work in wet areas with a protective sealer. See condo bathrooms and house bathrooms.

Design fees

Design fees

Interior designTypical fee, Miami 2026
Full interior design: layouts, finishes, lighting, drawings$8–12 per sq ft
High-end design with custom joinery and furnishing$15–25 per sq ft

Design can be bought on its own or as part of a full renovation. The fee depends on the size of the home and the scope, and we state it in writing after the site visit. See interior design with M5.

Your budget

How M5 protects the budget

  • An itemized estimate before the contract, 48 hours after our visit.
  • Payments by milestone, with no large upfront payment.
  • Change orders signed by you first.
  • Lien releases from every subcontractor.
  • Contract and partner insurance certificates on request.
  • A 1-year written warranty on every project.
FAQ

Questions

How much does it cost to renovate a condo in Miami?

A typical full renovation project with M5 is $200–250K. The exact price depends on the size, the scope, the finish level and the building. We price every project after visiting the space.

What does a kitchen remodel cost in Miami?

Typically $15–25K for a refresh, $40–80K for a full remodel and $100–200K for a high-end custom kitchen in 2026. It depends on how much of the kitchen moves, on the cabinetry and stone, and on the appliances. We give an itemized price after seeing the space.

What does a bathroom remodel cost in Miami?

Typically $8–14K for a powder room or refresh, $18–35K for a full bathroom and $38–70K for a luxury primary bathroom in 2026. It depends on the layout, the waterproofing, the stone or tile and the fixtures. We give an itemized price after seeing the space.

Why do renovation quotes differ so much?

Often the scope is not the same: one quote leaves out work another includes, or uses allowances instead of real prices. An itemized budget that changes only through a change order you sign first makes quotes comparable.

Free site visit

Get an itemized estimate

Itemized estimate 48 hours after our visit